Sprinkler Side-by-Side @ Lake Bluff
Lake Bluff Fire Department 45 E. Center Avenue, Lake Bluff, IL, United StatesReserved by Nancy Gusterine (event is 10/5/24)
Reserved by Nancy Gusterine (event is 10/5/24)
Drop off Dive Container 10/5 for Open House on 10/6
Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...
Dive Container-Open House
Training will be hosted by the Algonquin-Lake in the Hills Fire Protection District. Training topic will be jack stay patterns and sweep patterns. Please note that training will be limited to the first six divers who RSVP to Steve Ciaccio at [email protected].
Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...
Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...
Shore Based Rope Patterns Fox Lake Fire Protection District Address: 2700 Lauderdale Ct McHenry, Illinois 60051 Contact Name: Jake Geist Phone 8473709639 [email protected] RSVP Required: Yes Attendee Limit4 [email protected]
TRENCH 4 CONTAINER NEEDED Backfill options for shoring (Airbags, Backshore, Buttress) & Endwall shoring (Tension/Compression shore) Complete End Wall shoring system. Utilize Airbags, Backshore, Buttress systems, & Tension/Compression shore. OPS 8.1.01 Conduct A Size-Up 8.1.02 Implement Trench Action Plan 8.1.03 Implement Support Operations 8.1.04 Support Straight Wall Trench 8.1.05 Terminate Trench Operations 8.1.07 Disassemble Support Systems TECH 8.2.02 Install Sheeting ...