Training Calendar

  1. Events
  2. Training Calendar

Views Navigation

Event Views Navigation

Today

HazMat

Libertyville Station 1 1551 N. Milwaukee Avenue, Libertyville, IL, United States

Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Setup and operation of DECON 4 unit. Training Objectives 5.2.1 6.2.1 7.4.3.1 5.3.1 6.6.1 7.4.4.1 5.4.1 7.2.1 5.5.1 7.3.2 5.6.1 7.3.3 Date September 30, 2024 Start Time 9:00 AM End Time 12:00 PM Date October 1, 2024 Start Time 9:00 AM End Time 12:00 PM Date October 2, 2024 ...

HazMat

Libertyville Station 1 1551 N. Milwaukee Avenue, Libertyville, IL, United States

Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Setup and operation of DECON 4 unit. Training Objectives 5.2.1 6.2.1 7.4.3.1 5.3.1 6.6.1 7.4.4.1 5.4.1 7.2.1 5.5.1 7.3.2 5.6.1 7.3.3 Date September 30, 2024 Start Time 9:00 AM End Time 12:00 PM Date October 1, 2024 Start Time 9:00 AM End Time 12:00 PM Date October 2, 2024 ...

Dive

Peacock Camp (Lake Villa) 21777 W. Edgewood Avenue, Lake Villa, IL, United States

Team Dive Dive Training Type Open Water Dive Training Topic/Description Shore based patterns, utilizing SSA to locate a simulated victim. Training Objectives Rope patterns communications SSA system Date October 3, 2024 Start Time 9:00 AM End Time 12:00 PM Host Department/Agency Lake Villa Fire District Address 21777 Edgewood ave Peacock Camp Lake Villa, 60046 Contact Name Kevin Johnson Phone 8473567525 ...

HazMat Training – Long Grove

Long Grove Station 55 1165 Old McHenry Road, Long Grove, IL, United States

Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...

Dive Training

Three Oaks Recreation Area (Crystal Lake) 5517 Northwest Highway, Crystal Lake, IL, United States

Training will be hosted by the Algonquin-Lake in the Hills Fire Protection District.  Training topic will be jack stay patterns and sweep patterns.  Please note that training will be limited to the first six divers who RSVP to Steve Ciaccio at [email protected].

HazMat

Long Grove Station 55 1165 Old McHenry Road, Long Grove, IL, United States

Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...

HazMat

Long Grove Station 55 1165 Old McHenry Road, Long Grove, IL, United States

Team Hazardous Materials Hazardous Materials Training Type Regular Training Training Topic/Description Hydrogen Fluoride and Haz Mat for the IC Before Team Arrival Training Objectives 1. Identify scope of problem and actions needed. 2. Classify Haz Mat or WMD and collect response info. 3.Assess container conditions, predict, haz mat behavior and estimate potential outcomes. 4. IC Response Objectives & Actions, Group ...

Dive Team-Open Water Dive

2700 Lauderdale Ct McHenry, IL 2700 Lauderdale Ct, McHenry, IL, United States

Shore Based Rope Patterns Fox Lake Fire Protection District Address: 2700 Lauderdale Ct McHenry, Illinois 60051 Contact Name: Jake Geist Phone 8473709639 [email protected] RSVP Required: Yes Attendee Limit4 [email protected]

TRT – Trench Training

Wauconda Station 3 1300 S. Gilmer Road, Volo, IL, United States

TRENCH 4 CONTAINER NEEDED Backfill options for shoring (Airbags, Backshore, Buttress) & Endwall shoring (Tension/Compression shore) Complete End Wall shoring system. Utilize Airbags, Backshore, Buttress systems, & Tension/Compression shore. OPS 8.1.01 Conduct A Size-Up 8.1.02 Implement Trench Action Plan 8.1.03 Implement Support Operations 8.1.04 Support Straight Wall Trench 8.1.05 Terminate Trench Operations 8.1.07 Disassemble Support Systems TECH 8.2.02 Install Sheeting ...